Paper Machine: Replacement of Flowbox
Flowbox
Project scope:
Assets area: flowbox, wire section, constantteil, vacuumsytem, ventilation.
DCS: About 600 I/O’s new and about 280 I/O’s will be removed.
Specifications: Interfacing of the new FC‘s via CAN bus and profibus to the field controller.
IAS project:
- Verifying of the on-site status in the departments DCS, control engineering, electro-technics.
The manuals from the producer for the machine-oriented control is used as far as possible and aligned to the standard of the customer.
- The functions for the areas konstantteil, vacuumsytem, ventilation were developed in cooperation with the technical and production staff of the customer.
- Read out, programming, start up in shiftwork and optimisation of the machine-oriented control, konstantteil, vacuumsytem, ventilation.
- Interface definition and connection of the new functions to the remaining logik and to the QCS for the flowbox.
- Training of the customer staff.